Jump to content
Click here if you are having website access problems ×

Only 4 weeks till the green light ........


Jason Plato

Recommended Posts

Jobs to do - well, off the top of my head............

 

Collect running car from Arctic Circle (Bradford).

Sort out wiring lomb so it looks like a wiring lomb as opposed to a load of wires.

Take some bits off for powder coating.

Take car to Arch for re-skinning and coating of bits.

Pick car up from Arch.

Make loads of ally panels for various access points.

Fit loads of Pzeus fasteners to chassis and panels.

Fit inner panels.

Make holes in DIY transmission tunnel for gear change & reverse levers, fit Pzeus fasteners, fit tunnel cover.

Fit oil catch tank.

Change a bl00dy CV boot that I damaged 😳

Make and fit front undertray and rear diffuser (may just buy rear diffuser).

Make and fit sumpguard.

Refit front suspension (having been powder coated).Finish off brake plumbing and bleed brakes.

Fit heat shields and some cooling ducts.

Fit my stupidly wide wheels and make new front wingstays.

Fit front and rear wings.

Fit seat, belts, extinguisher, etc.

Fit rollcage, mirrors, padding, etc.

Fit and wire up datalogger/video recording gubbins.

Fit number roundels.

 

And last but by no means least.......

 

Make & fit new timing strut *wink*

 

Think that's about it. Should be enough to keep me busy.

 

Getting there.... *smile*

Link to comment
Share on other sites

Just get mine so it runs for more than ten minutes before breaking down, all other work having been done (miracle) and balance the brakes.

 

Then I have to make a tyre rack for the trailer, which is getting delayed as a mates fabrication workshop is so busy I can't borrow his equipment for even a couple of hours at the moment.

Link to comment
Share on other sites

Got a bit to do on mine but it's getting there. On the list includes..

 

Finish fitting engine (almost there now)

Complete plumbing everything in (coolant/oil system)

Sort out the wiring and new loom

Sort out the new petrol filler cap

Fit new rear wings+stone protectors

Finish fitting 2nd hand bonnet and get it painted

MOT

Emerald rolling road set-up

 

and most important of all learn how to drive it again!!

 

I should probably mention that the majority of the above is being done by Chris at the 7's Workshop!! as I've run out of time and ability 😬

 

Cheers

 

Rob G

www.SpeedySeven.com

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...