Jason Plato Posted March 25, 2005 Share Posted March 25, 2005 Can we get excited yet 😬 what jobs have you got to finish ? me , I've got undertray, straighten steering , sort out geometry , fit my new belts and polish the car 😬    C7 TOP Powered by Hellier Performance 😬 South Wales AO Link to comment Share on other sites More sharing options...
Silver 21 Posted March 25, 2005 Share Posted March 25, 2005 Rebuild my entire car still *confused* *confused* *confused* Graham Competition Secretary 2005 Speed Championship - 13 Rounds with 7 counting towards the championship Link to comment Share on other sites More sharing options...
Jason Plato Posted March 25, 2005 Author Share Posted March 25, 2005  C7 TOP Powered by Hellier Performance 😬 South Wales AO Link to comment Share on other sites More sharing options...
KenEvans Posted March 25, 2005 Share Posted March 25, 2005 4 weeks? I will have done five competitive events before Longcross Link to comment Share on other sites More sharing options...
Alex Wong1697456877 Posted March 25, 2005 Share Posted March 25, 2005 Sort out loud tappety noise and misfire when cold, straighten steering, elongate my gearlever, lose 3 stone. Link to comment Share on other sites More sharing options...
Irrelevant Posted March 25, 2005 Share Posted March 25, 2005 Jobs to do - well, off the top of my head............ Collect running car from Arctic Circle (Bradford). Sort out wiring lomb so it looks like a wiring lomb as opposed to a load of wires. Take some bits off for powder coating. Take car to Arch for re-skinning and coating of bits. Pick car up from Arch. Make loads of ally panels for various access points. Fit loads of Pzeus fasteners to chassis and panels. Fit inner panels. Make holes in DIY transmission tunnel for gear change & reverse levers, fit Pzeus fasteners, fit tunnel cover. Fit oil catch tank. Change a bl00dy CV boot that I damaged 😳 Make and fit front undertray and rear diffuser (may just buy rear diffuser). Make and fit sumpguard. Refit front suspension (having been powder coated).Finish off brake plumbing and bleed brakes. Fit heat shields and some cooling ducts. Fit my stupidly wide wheels and make new front wingstays. Fit front and rear wings. Fit seat, belts, extinguisher, etc. Fit rollcage, mirrors, padding, etc. Fit and wire up datalogger/video recording gubbins. Fit number roundels. And last but by no means least....... Make & fit new timing strut  Think that's about it. Should be enough to keep me busy. Getting there.... Link to comment Share on other sites More sharing options...
Mark Durrant Posted March 25, 2005 Share Posted March 25, 2005 Remove engine, replace leaking main oil seal, replace noisy CRB, change oil/filter and fit Hellier dry sump drain plug  In the meantime help Richard Anderson get his car back together which has no engine, gearbox or diff  Mark D Su77on Se7ens  Link to comment Share on other sites More sharing options...
Graham Perry Posted March 25, 2005 Share Posted March 25, 2005 Just get mine so it runs for more than ten minutes before breaking down, all other work having been done (miracle) and balance the brakes. Â Then I have to make a tyre rack for the trailer, which is getting delayed as a mates fabrication workshop is so busy I can't borrow his equipment for even a couple of hours at the moment. Link to comment Share on other sites More sharing options...
tom7 Posted March 25, 2005 Share Posted March 25, 2005 In no specific order, sort out my starting problem, MOT, tax, adjust clutch, bed in new brakes, wash, fit wing mirrors to aeroscreen, learn how to drive the thing again! Link to comment Share on other sites More sharing options...
Allen Payne Posted March 27, 2005 Share Posted March 27, 2005 Mark If Richard needs some help putting his car back together, let me know - I'm just around the corner. Link to comment Share on other sites More sharing options...
Mark Durrant Posted March 27, 2005 Share Posted March 27, 2005 Allen Many thanks. I think we should be OK for time but if we need an extra pair of hands I'll give you a shout  Mark D Su77on Se7ens  Link to comment Share on other sites More sharing options...
rgrigsby Posted April 2, 2005 Share Posted April 2, 2005 Got a bit to do on mine but it's getting there. On the list includes.. Finish fitting engine (almost there now) Complete plumbing everything in (coolant/oil system) Sort out the wiring and new loom Sort out the new petrol filler cap Fit new rear wings+stone protectors Finish fitting 2nd hand bonnet and get it painted MOT Emerald rolling road set-up and most important of all learn how to drive it again!! I should probably mention that the majority of the above is being done by Chris at the 7's Workshop!! as I've run out of time and ability 😬 Cheers Rob G www.SpeedySeven.com Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now